Lime kiln vertical kiln is one of the important equipment used for producing lime, and its price depends on multiple factors, including kiln construction, equipment procurement, installation and commissioning costs. When constructing a vertical lime kiln with a daily output of 100 tons, the budget is usually around 2 million yuan. Below will provide a detailed analysis of the price of lime kiln vertical kilns.
1. Kiln body construction cost
The main body of a lime kiln is the kiln body, and the construction cost of the kiln body is an important component of the construction cost. For a vertical lime kiln with a daily output of 100 tons, it usually requires an investment of about 2 million yuan for the construction of the kiln body. This includes costs for raw material procurement, construction labor, equipment installation, and other aspects. The quality and process of kiln construction directly affect the production efficiency and equipment operation stability in the later stage, so it is necessary to pay attention to quality control and process optimization during the construction process.
2. Equipment procurement costs
In addition to the construction cost of the kiln body, the equipment procurement cost of the lime kiln vertical kiln cannot be ignored. The equipment includes lime kiln body, limestone crushing equipment, limestone handling equipment, dust removal equipment, etc. The price of equipment varies due to factors such as brand, specifications, and performance, and for a daily production of 100 tons of lime kiln vertical kiln, the equipment procurement cost usually requires millions of yuan or even higher.
3. Installation and debugging costs
Installation and debugging are the last step in the construction of a lime kiln vertical kiln, and also a key link in ensuring the normal operation of the equipment. The installation and debugging costs include labor costs, equipment debugging costs, etc. During the installation and debugging process, professional technical personnel are required to operate the equipment to ensure correct installation and stable operation.
4. Other expenses
In addition to the main expenses mentioned above, there are also some other expenses that need to be considered in the total cost, such as land leasing fees, water and electricity fees, environmental protection facility construction fees, etc. Although these costs are relatively small, they also need to be planned in advance to avoid affecting the normal progress of the project.
The total cost of constructing a 100 ton daily output lime kiln vertical kiln is about 2 million yuan, of which the kiln body construction cost accounts for a large proportion, and equipment procurement cost is also an important part that cannot be ignored. In the project preparation stage, it is necessary to
fully consider various costs and make detailed budgets and plans to ensure the smooth progress and production of the project.